Timber Flooring Malaysia

Flooring Solutions for the Way You Live

Floor Installation | Timber Wood Flooring | Timber Floorboard Malaysia

Graphics below will roughly illustrate to you on how we deal, supply and install our Timber Floor products for all our clients. Please note that, this process flow is for your references only. Things may require altering accordingly to both mutual agreement between our sales representative and clients.

 Visitor
   
 Sales Representative
  • Our qualified sales representatives will call our clients for appointments within 48 working hours 
  • If possible, we would also require our client to fax or email their floorplan or BQ to us 
   
 Estimates
  • Upon site appointment, our sales representative will conduct an "On-Site" measurement and issued quotation on site after understanding our customer's requirements 
  • Upon confirmation, our sales representative will collect 50% deposit on timber wood flooring material cost 
   
 Delivery
  • Upon arrival, our sales representative will then collect the remaining 50% of the timber floorboard material cost 
   
 Installation
  • Duration of the floor installation process is very much depends on the scale of the project and choice of flooring material. For laminate flooring will take much shorter time than solid hardwood flooring 
  • One (1) time collection upon handover for laminate flooring projects 
  • Progressive claims on weekly basis for hardwood flooring projects 
   
 Happy Clients
  • Our customers are happy with our quality products during handover and we finally got another satisfied customer into our portfolio 
 

 

                                 ⇒⇒ Click Here To Our Products ⇐⇐